AMAIRA CREATION® · Fountain Design & Manufacturing

Fountain Basin — Civil Construction | AMAIRA CREATION

The structural tank and perimeter walls before tiling and finishing.

Basin construction before finishing

The photographs show a structural tank and perimeter walls before tiling and finishing. At this stage, dimensions, penetrations, waterproofing and maintenance access can still be coordinated with the intended fountain layout.

A basin needs an approved structural design and a compatible waterproofing system. Working water depth, freeboard, drain and overflow provisions should be specified separately from the overall wall height. Final quantities and structural reinforcement must follow the actual design.

  • Measure internal footprint and operating water depth.
  • Coordinate pipe penetrations and access before finishing.
  • Review waterproofing and water testing requirements.

Civil works · Before finishing

Fountain basin preparation

The structural tank and perimeter walls before tiling and finishing.

Untiled rectangular fountain civil basin with completed walls
Untiled civil-stage basin: first site view
Inside an unfinished fountain tank showing base and wall structure
Untiled civil-stage basin: second site view

All project documentation · Fountain installation services

Contact AMAIRA CREATION for a project enquiry